Gas Tax Projects

2010

Replacement of Culvert

Location:
Perth Road 147, Lot 31 -32, Conc 7, Elma TWP.

Description:
Replacement of the culvert will renew this particular capital asset, with a predicted lifespan of 80 years. The project will use pre-cast concrete sections, significantly shortening the construction period, allowing traffic to travel unimpeded for longer than would otherwise be expected with this type of project.

Total Cost of the Project: $ 424,011.27

Gas Tax Funding: $ 424,011.27

Reconstruction of Perth Road 180 and Structure # 180145

Location:
Perth Road 180 and Structure #180145 in Dublin Ontario.

Description:
Extends the asset lifespan of this road section for 15-20 years, will incorporate significant quantities of recycled and reclaimed material, and will alleviate existing issues with drainage and flooding.

Rehabilitation of County Bridge #180145, greatly increasing the remaining life expectancy of this asset by 40-50 years, which decreases the County's long-term capital needs.

Total Cost of the Project: $ 698,923.53

Gas Tax Funding: $ 698,918.56

2009

Perth Line 32 Resurfacing

Location:
Perth Line 32, from Perth Road 130 to Perth Road 122

Total Length: 4.1 KM

Description:
Cold in Place recycled and overlaid with hot mix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of greenhouse gases. The asset lifespan of this road section will be extended to 15-20 years.

Total Cost of the Project: $521,365.54

Gas Tax Funding: $473,365.54

Perth Road 139 Resurfacing

Location:
Perth Road 139, from Perth Road 180 to Town of St. Mary's limit.

Total Length: 9.0 KM

Description:
Cold in Place recycled and overlaid with hot mix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of greenhouse gases. The asset lifespan of this road section will be extended to 15-20 years.

Total Cost of the Project: $1,300,245.09

Gas Tax Funding: $1,127,608.43

 

2007

Perth Road 163 Resurfacing

Location:
Commencing at Rannoch and extending north for 7.9 kilometres.

Description:
Cold in Place recycled and overlaid with hotmix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of green house gases.  The asset lifespan of this road section will be extended to 15-20 years.
 
Total Job Cost: $992,000.00
 
Gas Tax Funding: $593,493.67

 

2006

Perth Road 135 Resurfacing

Location:
Commencing at the north limit of Rostock, north to Perth Line 55. Distance of 6.1 kilometres.

Description:
Cold in Place recycled and overlaid with hotmix that includes RAP which will reduce the identified capital needs of the County and improve the quality of road leading to improved safety and reduction of green house gases. The asset lifespan of this road section will be extended to 15-20 years.
 
Total Job Cost: $615,141.38
 
Gas Tax Funding: $579,790.70

Culvert Replacement 044-013

Location:
Concession 8, Lot 3 Township of Perth East, Ellice Ward 

Description:
The culvert at this location was replaced resulting in a reduction of the identified capital costs needs of the County, safety improvements and elimination of the need for load limit restrictions.
 
Total Job Cost: $214,301.01
 
Gas Tax Funding: $ 33,733.00

Culvert Replacement 086-103

Location:
Concession 1, Part Lot 1 Township of Perth East, Mornington

Description:
The culvert at this location was replaced resulting in a reduction of the identified capital costs needs of the County, safety improvements and elimination of the need for load limit restrictions. 
 
Total Job Cost: $129,429.99
 
Gas Tax Funding: $18,333.00